Supply Record of EHV XLPE Cable More Than 200KV
Location System
Voltage
(kv)
Conductor
(mm²)
Cable
Length
(km)
Year
Ordered
Features
Nagoya S/S
Japan
275 800 0.4 1979 Installed in substation and terminated by outdoor ends.
Ikegami S/S
Japan
275 800 0.5 1984 Installed in substation and terminated by oil-immersed ends and SF6 ends.
Shajiao
China
220 1200 8.6
1.2
1984
1985
Installed in substation and terminated by outdoor ends and SF6 ends.
Minami Ikegami
Japan
275 1400 5.4
5.4
1986
1989
Installed in underground transmission line and jointed by Extrusion molded joints (24/EMJ).
Minami Route
Japan
275 2500 50.3 1989 Installed in underground transmission line and jointed by Extrusion molded joints (102/EMJ).
Chushin S/S
Japan
275 600 1.9 1991 Installed in substation and terminated by oil-immersed ends, outdoor ends and SF6 ends.
Beijing
China
220 630 9.0 1991 Installed in underground transmission line, terminated by prefabricated outdoor ends,
and jointed by prefabricated joints (12/PJ).
Nankatsu-Setagaya
Japan
275 1400 68.2 1991 Installed in underground transmission line, terminated by SF6 ends and jointed by Extrusion Molded
Joints(99/EMJ).
Yokohama-Kouhoku
Japan
275 2500 32
11.3
1992
1994
Installed in underground transmission line, and jointed by Extrusion Molded Joints(90/EMJ)
Minami Souma S/S
Japan
275 2000 3.9 1993 Installed in S/S and terminated by outdoor ends and SF6 ends.
Ozone
Japan
275 1500 20 1993 Installed in underground transmission line, terminated by outdoor ends and jointed by
Prefabricated Joints (48/PJ).
Tokau-Matsugae
Japan
275 2500 19.8 1995 Installed in underground transmission line, and jointed by Extrusion Molded Joints(12/EMJ).
Ama-Matsugae
Japan
275 2500 38.9 1996 Installed in underground transmission line, terminated by Sf6 ends and jointed by Extrusion Molded
Joints(24/EMJ).
Shinkeiyo-Toyosu
Japan
500 2500 59.5 1996 Installed in underground transmission line, terminated by SF6 ends and jointed by Extrusion Molded
Joints (69/EMJ).
Nishifukuoka
Japan
220 1500 11.3 1996 Installed in underground transmission line, terminated by SF6 ends and jointed by Prefabricated
Joints(21/PJ).
Beijing
China
220 1000 10.4 1997 Installed in underground transmission line, terminated by Prefabricted outdoor ends and jointed by
Prefabricated Joints (15/EMJ)
Toyosu-Uchisaiwaicho
Japan
275 1400 58.7 1997 Installed in underground transmission line, terminated by SF6 ends and jointed by Extrusion Molded
Joints (63/EMJ).
Okutataragi P/S
Japan
500 800 4.4 1997 Installed in water power station and terminated by Oil-immersed ends and SF6 ends.
Koyna Hydro P/S
India
420 800 6.5 1997 Installed in water power station and terminated by outdoor ends and SF6 ends.
Sannomiya
Japan
275 1500 30.0
0.54
1997
1998
Installed in underground transmission line, terminated by outdoor ends and jointed by Prefabricated
Joints (48/PJ).
Second Shuikou P/S
Japan
220 2000 0.7 1997 Installed in substation and terminated by Prefabricated outdoor ends.
Tin Wan S/S
Hong Kong
275 400 0.25 1997 Installed in substation and terminated by Prefabricated SF6 ends.
Zuoanmen Extension P/J
China
220 1500 0.26 1998 Installed in substation and terminated by Prefabricated outdoor and SF6 ends.
Tachibanawan P/S
Japan
500 1000 4.80 1998 Installed in thermal power station and terminated by SF6 ends.
Nishiosaka S/S
Japan
275 1000 0.26 1999 Installed in substation and terminated by Prefabricated SF6 ends.
Kawasaki Karyoku-Ota
Japan
275 2500 20.24 1999 Installed in underground transmission line and jointed by Extrusion Molded Joints (9/EMJ)
Jiangsu/Nanjing
China
220 800 45.0 1999 Installed in underground transmission line, terminated by prefabricated outdoor ends
and SF6 ends, jointed by Pre-molded Joints (66/SPJ).